Home > Case Study > February 2011
Bridge Repair with WEBAC range of product [Feb 2011]
Bridge_Repair.gif Segments of a concrete bridge over Kosi River were impacted by a hydraulic lift trolley being shifted to side bays of stacking yard. The self weight of each segment was approx. 90 MT and during shifting to side bay on hydraulic lift trolley, due to change in supports of the segments of the pre-stressed concrete bridge, resulting in severe cracking.
  More...
 
Wirtgen India
The Big 5 Construct India 2013
Pennar Industries
Nicomac doors Pvt Ltd
Tata Motors
Roof india 2013
Interarch
Tata Blue Scope
Rai Fasteners (Wictory)
Volvo
H & K India
Vashi Electricals Pvt. Ltd
Terex
Shriram Equipment Finance
Case Construction
Hindalco Everlast
Dan Aluform Consultancy
Proman
Schwing Stetter (India) Pvt Ltd
Layher Scaffolding
FMT Engineers Pvt. Ltd
Carlisle
STP Limited
CICO
KiTEC