Home » Structure » Overcoming complex design constraints with innovative solutions for a massive aircraft hanger

Overcoming complex design constraints with innovative solutions for a massive aircraft hanger

By | October 27, 2023 2:42 pm SHARE

Overcoming complex design constraints with innovative solutions for a massive aircraft hanger
.

In a major Indian city, Everest faced a challenge: building a massive 93-meter clear-span aeroplane hangar under strict floor area limitations. Discover how they innovatively overcame these constraints, defying norms for an exceptional hangar.

Project brief: 

Everest executed a prestigious project of a commercial aeroplane hangar with a clear span of 93 m in one of India’s leading metros. Indigo, the end user and consultant, had specific limitations of floor area usage strictly imposed by the authorities that were making the design of the aeroplane hangar impossible by conventional methods – called a “fixed base” design. 

Everest_b2b

Challenges and solutions

The design and engineering team of Everest worked with the consultant and understood the reason for the limitations in space. Once the same was acknowledged as non-negotiable, the design team from Everest revisited the design concept and successfully performed the design using the “pinned base” philosophy. 

In a fixed base design, the vertical columns supporting the structure transmit the imposed loads and the moment to the base via their base plates. Since the size of the base plate has a direct bearing on the size of the concrete pedestal where anchor bolts are cast, this directly causes the civil work sizes to increase in the form of a heavier pedestal. 

In a pinned base design, the moments are absorbed and compensated at the joint between the column (vertical member) and rafter (horizontal member). This means that the coupler between the column and rafter (called “haunch”) is designed to be much heavier and rigid. 

The key challenges in a pinned base design include heavier haunches and iterative designs, including kicker elements (plates provided at the haunch) to the higher loads and higher deflections at the centre of the rafters. These require an intimate compensation understanding of the interplay between the various forces and the sensitivity of members to each. ESBS design team is very well versed in these complexities and could easily handle this complex design without compromising the integrity or safety of the hangar. 

Conclusion

 Using a pinned base reduced the area of the base plate by nearly 70 percent, and an overall saving of 10 percent was affected in the weight. In addition, the inside-to-inside and outside-to-outside dimensional limitations of the hangar were also maintained. 

Expertise shared by Gaurav Awasthi, Head-Business Development & Marketing, Everest industries ltd.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Kennametal
B2B eMagazine December 2024
B2B eMagazine December 2024

Events

Constro 2025
Weldtech 2025
Chhattisgarh Mining Show
Odisha Mining Show
Metal Forming Expo
Roof India

Our Partners

Avians Innovations Technology
Volvo Penta
MB Crusher
Bullflex Rubbers
Cloos India Welding Technology
JSW Cement
Filtrec
Tacklers
BKT
Volvo
Blastline India
Sec RJMT
Power Screen
OLI Vibrators India
RSB Transmissions
Roots Auto Products
Rossi Gearmotors India
Abhay Rana Infra Service
Supreme Industries
Vermeer India
Ashar Locker India
Baudouin India
Doosan
Indo Chain
bondioli
Aquarius Engineers
Esquire Machines
Siddhivinayak Engg
Hectronic
Forech
Burner India
Mallcom
Kamlesh Metal
Tripcon
Terra Form Geotech
XPS India
Locwel
Molygraph
Velvex
RDC
Kennametal
SNTP
NBC Bearings
Enovation
HYVA
MMD
INGECO
Vishwakarma Perforators
Swagath Urethane Pvt Ltd
Build Smart