Layher Scaffolding: ideal for high-rise building
By Edit Team | December 19, 2014 10:49 am SHARE
“Due to innovative products, superior technical solutions and Layher’s absolute customer orientated service package Layher has become the standard in scaffolding systems worldwide”
Layher Group produces high-quality scaffolding systems in Germany. Layher has worldwide presence with more than 30 sales subsidiaries. The products are being used by industries like construction, chemical plants, power plants, shipyards, refineries and offshore.
Layher products and services
Layher’s present product characteristics and services help customers achieve long-term success and increase the profitability of their companies. The Layher Scaffolding has been established as a synonym for modular scaffolds on the market. The Allround and SpeedyScaf Scaffolding offers unsurpassed versatility to be used in construction sites, chemical industry, power plants, aircraft, shipyards, event sector, theatres and arenas.
Layher scaffolding uses a simple, unique and bolt free connection technology. Sliding the wedge head over the rosette and inserting the wedge into the opening immediately secures the component. There is still sufficient play to secure the other end of the ledger. A hammer blow to the wedge transforms the loose connection into a superbly strong structurally rigid one. The face of the wedge head is now precisely positioned against the standard.
To transfer pulling force, every frame is secured by locking pins or bolts to each other. In this way the tower can be assembled on the ground and placed by crane.
The Allround connector is central element in the Allround modular system and the basis for the economic efficiency, high stress capability and safety of the entire system. This positive and force transmitting connection method is equally suitable for both steel and aluminium scaffolding structures.
Success Story
Construction of façade scaffold about 90 metres high was a big challenge while executing the tallest building in Turkey. Not only has the corner and projected balcony of the building is challenge of this project.
By bracing the work scaffolding vertically with SpeedyScaf lattice beams, even the increased wind loads could be transferred without putting unnecessary strain on the structure.
With Layher Scaffolding Systems, the scaffolders had the ideal equipment for economical provision of scaffolding around the Façade 95 metres. Easy assembly and the use of a hoist meant that the assembly time was just five weeks. Thanks to the outstanding quality of Layher’s products, the lower assembly frames and the spindles can withstand enormous loads. Load bearing capacities of individual spindles (baseplate) are subjected to a weight of up to 5 tons.
During the construction the biggest challenge was posed by the recessed balconies on every second side of the building. Providing scaffolding around these drew on all the experience of the scaffolding erectors and flexibility of systems. But this problem too was quickly overcome with special structures.
Especially on irregular designs due different sizes of corner, the Allround/Speedyscaf Scaffolding impresses with its flexibility and the safe and easy handling. With its advantages like screw-less quick and self-explanatory assembly, form-fitting and solid connection, dimensional stability and rigidity, scaffolders quickly create safe workspaces for the following assembly sections. Even in highest altitudes – and under high loads. After all, heavy stones have to be stored temporarily on the scaffold during the renovation.
Layher Allround has a suitable solution for all access need on construction site. Access stairway towers for a broad spectrum of applications and requirements are created at the site for hoisting of concrete buckets, passenger hoist and to accommodate and safe modular stairway/access modular, accesses that always fit and that match the system can be constructed (replacement of huge quantities of scaffolding pipes and clamps) are possible by using Allround Scaffold Systems.
Authored by__
Mithilesh Kumar, Director,
Layher Scaffolding Systems Pvt Ltd