Riddhi Enterprise has constantly been offering various solutions to meet needs of construction industry. Now it has come up with its new innovative solutions.
Low viscous epoxy and PU groutingLow viscous epoxy is used to fill and seal voids and cracks in structures such as bridges and other civil engineering buildings, industrial and residential buildings, e.g. columns, beams, foundations, walls, floors and water retaining structures.
PU grouting is used for permanent watertight sealing with some flexibility to absorb limited movement, in dry damp or water bearing cracks and joints in concrete, brickwork and nature stone.
High pressure grouting machineIt is the professional machine which is applied in the structure perfusion, equipped with super pressure. To solve out the inconvenience of the carrier, it is very light and and thus suitable choice of stanch worker.
Features:• Speedy construction: It can be advanced to 10,000 PSI in a few seconds, and the working time will be shorter than other machine• Single line discharge for pre-mixed resins • Light-weight and simple operation • Remote switch operated and easy flush after usage • Simple maintenance: It can be fixed without special training, to avoid the delay for the machine fixing• It can be effused into the small slot effectively, and envelop the leaking.
Standard specifications: • Machine body with 5 metres high pressure pipe • Switch valve suit (including butter head) • Low gross: It is only 9 kg, easy to carry• Max output pressure: 11,000 PSI • Star-up: < 7,500 PSI • Safety scope of high-pressure pipe: < 14,000 PSI • Safety scope of on-off Valve: < 18,000 PSI • Safety scope of butter head: < 16,000 PSI • Electric drill machine • Maintenance saddlebag• Discharge – 0.9 lpm.
Application scope: • For the crack, flexing crack, construction crack, and instruction crack of building and concrete project• Cracking of building, girder, pole, board etc. structure, inject epoxy resin with high-handed• Leak stopping for underground, tunnel, culvert, sewage disposing pool, concrete fissure• Leak stopping for floor, wall pipe, and wall corner • Grouting of reservoir and dam for the water conservancy project, leak stopping of the water transporting tunnel, seepage control of the concrete crack of the embankment• Leak stopping for basement, underground garage, and underground channels• Leak stopping for the breast wall of artesian well in geologic drilling project.
Cookie Consent
We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.