B2B Purchase - Project Procurement Professionals

Suretech
Suretech
TCI
TCI
Home » Structure » Agility towards changes gave us an edge in project management: Everest Industries

Agility towards changes gave us an edge in project management: Everest Industries

By | December 14, 2022 12:40 pm SHARE

Agility towards changes gave us  an edge in project management: Everest Industries
.

Project Brief
IFB Refrigeration Ltd. planned to set up a new facility for manufacturing refrigerators in Maharashtra. After due diligence and discussions with the consultant, the client chose Everest to execute the project  based on the trust built over a previous project. This project was significant as the facility was critical for increasing the production capacity. Everest had a dual responsibility to
execute a quality job in the current project and retain its reputation as a  reliable partner, which was an important aspect. Regular interactions were carried out at the consultant and client’s offices
and on-site to understand the project’s intricacies. Detailed planning was carried out at all phases of the project. The aim was to execute the project within the time frame required by the customer without overlooking economics.

Construction material
All materials for the building were carefully chosen to meet the client’s requirements for the project. After considering surrounding weather conditions throughout the year at the site, mineral wool  f a specific R-value was chosen for roof insulation to maintain the desired temperature inside the building.

Architectural features
The building’s layout maximises unobstructed space for  material and people movement. The depth of mezzanine beams was limited to provide maximum clear height under the deck slab. The standing seam was used as a roofing solution for durability  and water tightness to prevent leakages, which increased the project lifecycle phenomenally. Horizontal cladding colour bands in the wall and louvres were important features in the project. As desired  y the end user, the right amount of ventilation was achieved for the building using roof monitors and louvres. These features provided the required air changes per hour for a fatigue-free  working environment for labour, thus ensuring more productivity. Polycarbonate sheets were chosen to  provide diffused ambient light inside the building. Everest wall cladding of the desired colour as also used to make the façade attractive. Flush and cantilever fascia and canopies with reverse slopes were used to ensure an excellent aesthetic look.

Geometry
The building had critical height requirements concerning Lean-To and  EOT cranes and spans more than 350 metres in length, which makes the  building susceptible to temperature effects and  tresses during temperature variance. Provisions were made to relieve such temperature stresses. The building also has a mezzanine area designed as a composite deck slab. Portal and cross bracing were used in conjunction for lateral stability and openings.

Uniqueness
There are different kinds of loading, like collateral loads on the roof, solar panel loads, etc. Jack beams were introduced for better space utilisation and more accurate machinery and equipment installation without forgoing the critical aspect of optimising structural steel. This made the project unique in its way.

Challenges
Horizontal wall cladding installation was a challenging task from an  aesthetic point of view. The strict timeline made the task more critical. Everest’s team was always alert for any unforeseen  challenges. This helped quickly resolve challenges and avoided any impact on the project timeline. Meticulous execution by the Everest site management team and effective coordination with the project management team and the consultant led to the achievement of milestones and kept the project on track for timely completion.

In Conclusion The deeply forged relationship between the client, consultant, and Everest Industries Limited, facilitated excellent and effective communication among all stakeholders. This led to optimum project design, resulting in substantial  cost savings for the client. Many challenges and last-minute changes  were resolved immediately without impacting the project timeline.

Fabricator’s  quote:
“The IFB Refrigeration Limited project executed by Everest Industries Limited  was unique because of the technical requirements of the most demanding customer, who has a hunger for quality without foregoing economics. It was a strategic project for Everest because we had to shoulder the responsibility of executing this technically challenging project within the constraints of a limited budget and strict timelines. More importantly, we had the opportunity  to retain our existing customers. This project also had all labour-related challenges in Ranjangaon that needed to be addressed without jeopardising project timelines. With this project, Everest has yet again proved to be a reliable partner to our customers and has raised the bar higher within the company with  his success.”
“We are poised for many more challenging projects to come our way in the future,” says Everest Steel Building Solutions’ National Sales Head, Amit Khaparde  “This is an extraordinary project for  FB Refrigeration Ltd., where they are going to manufacture refrigerators.” Based on our past experiences with Everest, we chose them to execute this building on a tight schedule. Everest has done   great job and has performed well in terms of quality, time, and services. Everest extended continuous support and agility in incorporating last-minute, essential changes in the building during the  xecution stage, which gave them an edge. Their swift response ensured project execution within the expected time frame. Vaibhav Warade, Project Manager, PC Designs Pvt. Ltd. 

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Urbanova25
Urbanova25
Webinar

Events

Weldtech 2025
Chhattisgarh Mining Show
Urbanova25
Odisha Mining Show
Metal Forming Expo
Roof India
Intralogistics & Warehousing Expo
Wiretech 2025

Our Partners

Colorshine coated
Avians Innovations Technology
JSW Cement
Filtrec
Arispl
BKT
Sec RJMT
OLI Vibrators India
Supreme Industries
Ashar Locker India
Tripcon
ENSO Oils & Lubricants
NBC Bearings
HYVA
INGECO
Build Smart
Macaw Paints
KHANNA PAINT TESTING LABORATORY OPC PVT LTD
Indiabulls
RD Infra Equipments Pvt Ltd
Techfab India
TILARA POLYPLAST
Sicoma
Sharp Ply
Honda India Power
CJ Darcl Logistics Limited
Layher Scaffolding Systems Pvt. Ltd.
Maharshree Geomembrane
Asian Paints
Elmechengineers
Tata Hitachi Construction
Magicrete
Hyve Group
Vinni Chemicals
Elev8 Lift
Bajaj Indef
Sohal Lal Gupta
Everest steel buildings
MSP Steel
Vibrant Construction
Ammann Group
Schwing Stetter India
Tata Steel limited
Larsen  Toubro Limited
ALP Aeroflex
Hindalco Everlast Industries
Atlas Technologies
Case Construction
Kitec Industries Pvt Ltd
Landmark Crafts Pvt Ltd