Infrastructure development is the need of the hour for the Indian economy – be it roads, railways, metro-rail, airports or affordable housing. Construction of bridges is at the core of any development for roads, railways and metro rail.
Modern bridge construction demands technologies, which are faster, safer and innovative.For nearly 50 years, PERI products and systems have successfully proved themselves in the market globally. PERI has developed ground-breaking formwork and scaffolding technologies, which continues to set standards in the industry. With landmark projects such as Mahatma Mandir, the Statue of Unity, Agra-Lucknow Expressway, Hyderabad Metro, Mumbai Metro, Bengaluru Metro using our state-of-the-art formwork and scaffolding system, we have proved our mettle in delivering customised solutions for every complex need in a cost-effective manner.PERI formwork technologies can really fast track the construction.
National Highways Authority of India (NHAI) has constructed six-lane highway over Chambal river. Project includes total 43 Piers for bridge with varying height of 27 metres. The pier size at bottom was 7500mmx2500mm and at top is 7000mmx2000mm (i.e. reduction of 500mm) Semi-circular at both the end. Also, it has limited access to crane as it is over a river.
PERI provided solution with Hydraulic climbing system RCS along with VARIO formwork system. Customised solution was provided with adaptor in order to climb the system.
Vijay Mistry construction Pvt Ltd was contractor for the project. They could complete project faster with two sets of VARIO formwork system. One set for 7500mmx2500mm and another set for 7000mmx2000mm size reduced the cycle time to four days.
For any further information,
please visit www.peri.in