Everest was selected to build a large greenfield aesthetic Grade A Warehouse as the PEB manufacturer offers turnkey solutions starting from design and supply to erection.

Project Brief
Reliance Industries Limited wanted to develop a greenfield warehouse facility in Haryana. The investment was part of the company’s larger expansion plan to cover the country. Reliance Retail was expanding its retail network to cover the entire country, beyond the 500 towns where its physical stores are operational, using a hybrid online-offline model. The distribution centre would act as a centre point for all the nearby stores, and products would be sorted, packed, and tagged in this warehouse for sending to the company’s retail stores.

After a stringent short-listing process, Everest was chosen as the preferred PEB supplier to execute this large warehouse project. Everest’s scope of work included complete solutions starting from design and engineering, fabrication, and supply to erection of the complete warehouse spread over an area of 4,04,350 SFT.

Geometry and architectural features
The building has a length of 235 meters and a width of 160 meters. The warehouse also has a mezzanine floor and lean-to building to meet the user’s functional requirements. For high energy conservation levels, fibre glass insulation was provided in the roof and wall cladding systems.

Everest_B2B Purchase

Challenges
The Everest team faced a series of challenges, starting from design and engineering to the erection of the warehouse in such a strict time frame. The client wanted the design and engineering team to reduce the number of intermediary columns for installing a maximum number of racking systems inside the building and have a single 80-meter-long roofing profile on the warehouse roof to minimise the possibility of leakage.

Solution
Everest’s design and engineering team completely met the client’s requirement for space optimisation inside the warehouse building to accommodate a maximum number of storage racking systems by providing jack portal. The expert engineering team at Everest designed continuous jack portals along the jack beam line to control the deflections and maximise the storage space inside the warehouse.

To cater to the client’s need for a single 80-m-long roofing profile and minimise leakage risk, the erection team completed the roll forming of the roofing profile on site and carefully installed the 80-m-long roof sheets on the warehouse building. The team faced another challenge while lifting the 80-meter-long sheets to a height of 13 meters due to the risk of rupture during the lifting process. To counter this challenge and further decrease the timeline, the roll-forming machine was lifted and placed on a platform at 14m. The total length of 160 m of the warehouse building was then covered in a single overlap of 2 sheets of 80m each to provide an all-weather SS leakproof roofing system per the client’s requirement.

Conclusion
The highly experienced engineering and erection team at Everest worked meticulously to keep the client updated about the challenges and progress of the project. Everest successfully delivered the greenfield aesthetic Grade A warehouse infrastructure for Reliance Industries Limited in a stringent timeline, following all the safety standards.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

QR Code

Comments

Leave a Reply

Copyright © 2024 – I-Tech Media Pvt. Ltd. All rights reserved.